BICSI DCDC-002 Certification Exam is an essential certification for professionals working in the data center design industry. With its comprehensive coverage of critical topics, recognition by industry leaders, and high level of difficulty, this certification is an excellent way for professionals to demonstrate their expertise and commitment to the field.
BICSI DCDC-002 is a certification exam that is designed for individuals who want to become a BICSI Data Center Design Consultant. DCDC-002 exam is designed to test the candidate’s knowledge and skills in data center design, planning, and implementation. BICSI Data Center Design Consultant - DCDC certification is recognized globally and is considered to be a benchmark for data center design professionals.
BICSI DCDC-002 certification exam is a comprehensive assessment designed to evaluate the knowledge and skills of professionals who specialize in data center design. DCDC-002 exam is aimed at individuals who have extensive experience in the field and are looking to demonstrate their expertise to potential employers and clients. BICSI Data Center Design Consultant - DCDC certification is widely recognized as a mark of excellence in the industry and is highly valued by employers.
NEW QUESTION # 19
What is the minimum access floor to ceiling height recommended?
- A. 11ft minimum
- B. 8 feet minimum
- C. 10 feet minimum
- D. 9 feet minimum
Answer: C
NEW QUESTION # 20
What is the recommended range of temperature for a data center?
- A. 26-30°C (79-86°F)
- B. 24-28°C (75-82°F)
- C. 20-24°C (68-75°F)
- D. 22-26°C (72-79°F)
- E. 18-22°C (64-72°F)
Answer: C
NEW QUESTION # 21
why does the entrance room designer need to meet with each anticipated access provider?
- A. As an alternative approach to save cost
- B. To know about hardware requirement only
- C. To determine their electrical, space, interface, and other facility requirements
- D. none of above
Answer: C
Explanation:
Explanation
NEW QUESTION # 22
Apart from Power usage effectiveness or P U E, and Data center infrastructure Efficiency Or D C i E, what other standardized measurements are there for data center efficiency?
- A. Return temperature index.
- B. None of The Above.
- C. Energy efficiency Ratio.
- D. All of the above
Answer: D
NEW QUESTION # 23
What is the minimum slab floor to ceiling height recommended?
- A. 16feetminimum
- B. 14feetminimum
- C. 12feetminimum
- D. 15feetminimmum
Answer: D
NEW QUESTION # 24
How do you calculate thermal load in a data center?
- A. IT Thermal Output + Cooling System + Lighting System
- B. IT Thermal Output + Lighting System
- C. IT Thermal Output + Cooling System + Lighting System + PDU System
- D. IT Thermal Output + Cooling System
- E. IT Thermal Output + PDU System
Answer: C
NEW QUESTION # 25
Why do larger data centers require more H DAs?
- A. to provide redundancy and failover mechanisms
- B. to ensure maximum horizontal cable lengths are not exceeded and to avoid cable congestion
- C. to reduce energy consumption and carbon footprint
- D. to increase server processing speed by minimizing latency
Answer: B
NEW QUESTION # 26
Apart from marine cargo ports, hazardous material transport roadways, transportation roadways, and flight paths, what other things should a data centre be at least one mile away from?
- A. Fireworks manufacturing companies only.
- B. Waste-disposal units and dumpsites only.
- C. All of The Above
- D. Petroleum storage installations like petrol stations & oil storage facilities only.
Answer: C
NEW QUESTION # 27
How far should Data Center be located from Commercial Airport?
- A. At Least 3 Miles
- B. None of the above.
- C. At least 10 miles
- D. At Least 5 Miles
Answer: D
NEW QUESTION # 28
How often is there typically a technology refresh in a data center?
- A. Every 1-2 years
- B. Every 7-10 years
- C. Every 3-5 years
- D. There is no typical refresh cycle
Answer: C
NEW QUESTION # 29
When is a battery room required to have electrolyte spill containment and exhaust systems?
- A. When corrosive fumes are detected in operation room
- B. When the ceiling suspended load capacity is below 20 pounds per square foot
- C. when the potential for outgassing hydrogen exists
- D. when the battery weight exceeds 500 pounds
Answer: C
NEW QUESTION # 30
What is minimum recommended generator fuel storage amount?
- A. enough to run 24 to 36 hours at full load
- B. enough to run up-to a week at full load
- C. enough to run 48-72 hours at full load
- D. enough to run 4 to 16 hours at full load
Answer: C
Explanation:
Explanation
NEW QUESTION # 31
What are the different generator ratings?
- A. Primary, Secondary and Tertiary
- B. Normal, Redundant and Fault-tolerant
- C. Prime, Continuous and Standby
- D. Standard, Backup and Emergency
Answer: C
NEW QUESTION # 32
What is the Fourth Preference Regarding Utility Service?
- A. Two balanced feeds with different voltages derived from a single distribution station
- B. One circuit from one substation, separate paths
- C. At least four circuits each from different distribution stations but fed via common feeders
- D. At least two circuits from one substation fed via alternative power grid
Answer: B
NEW QUESTION # 33
What is the typical air delivery temperature from a CRAC unit?
- A. 20-25 degrees Celsius
- B. 10-13 degrees Celsius
- C. 15-18 degrees Celsius
- D. 13-16 degrees Celsius
Answer: D
NEW QUESTION # 34
What is the recommendation regarding row length?
- A. Maximum twenty-five racks in each row only
- B. None
- C. Do not exceed 20 racks in length and dead-end rows not to exceed ten racks long
- D. Ten Racks in Length
- E. All
Answer: C
NEW QUESTION # 35
What should be done with unused rack space?
- A. it should be used for additional storage purposes
- B. they should be turned off to save energy costs
- C. it should be filled with blanking devices to reduce non-functional airflow
- D. it should be left open to allow for better ventilation
Answer: C
NEW QUESTION # 36
Where is the recommended location for remote power panels?
- A. at one or both ends of an equipment row
- B. outside the building
- C. suspended from ceiling
- D. inside a sealed room
Answer: A
NEW QUESTION # 37
What is the difference between N+1 and 2N redundancy?
- A. N+1 redundancy means that there is one additional backup component while 2N redundancy means that there are two identical backup components
- B. 2N redundancy is more cost-effective than N+1 redundancy
- C. N+1 redundancy is more flexible and adaptable to changing needs than 2N redundancy
- D. N+1 redundancy is more reliable than 2N redundancy
Answer: A
NEW QUESTION # 38
What are main concepts in choosing location of the entrance room?
- A. If possible, it should be very close, and, in the computer room distance limitations for T1,T3,E1,and E3 circuits,
- B. Dedicated location outside building
- C. All of these
- D. Should not be near to Data Center
Answer: A
Explanation:
Explanation
NEW QUESTION # 39
What are the equipment clearance/access requirements when designing the door openings and loading dock areas for a data center?
Answer:
Explanation:
Clearance requirements of 10' L x 4' W x 8' H and 7500 pounds
NEW QUESTION # 40
......