NEW QUESTION 43
How Is the bill of material (BOM) exploded when you use a BOM explosion number?
Please choose the correct answer.
Response:

  • A. With respect to a common key date for product and each assembly
  • B. With respect to a defined separate change status for product and each assembly
  • C. With respect to defined separate key dates for product and each assembly
  • D. With respect to a common change status for product and each assembly

Answer: C

 

NEW QUESTION 44
You run MRP for a material that was planned using Demand-Driven Replenishment. Toward which buffer level does the MRP run create a replenishment proposal?

  • A. Top of Red
  • B. Top of Yellow
  • C. Top of Red Base
  • D. Top of Green

Answer: D

 

NEW QUESTION 45
You need to model goods receipt processing time in Detailed Scheduling. Which modelling options do you have? Note: There are 2 correct answers to this question.

  • A. Model a resource inbound in the location master.
  • B. Model a transportation resource in the location master.
  • C. Model a handling resource in the location master and goods receipt time in the mater all master.
  • D. Model a separate resource in the production data structure.

Answer: B,C

 

NEW QUESTION 46
Which bill of material (BOM) categories can you define in SAP S/4HANA? Note: There are 2 correct answers to this question.

  • A. Work Center BOM
  • B. Sales Order BOM
  • C. Functional Location BOM
  • D. Class BOM

Answer: B,C

 

NEW QUESTION 47
Your project team decides to use a make-to-order planning strategy for a strategic material in discrete manufacturing. What is the impact of this decision? Note: There are 3 correct answers to this question.

  • A. Sales order-specific planning run is required.
  • B. Sales order-specific stock is created
  • C. Production orders are created with sales order reference.
  • D. Storage location MRP areas are required.
  • E. Net requirements calculation is sales order-specific.

Answer: B,C,E

 

NEW QUESTION 48
Which time elements can be reduced by a reduction strategy? Note: There are 3 correct answers to this question.

  • A. Wait time
  • B. Float after production
  • C. Goods receipt processing time
  • D. Queue time
  • E. Move time

Answer: B,D,E

 

NEW QUESTION 49
Your customer complains about incorrect duration for production order operations. What time elements could cause the issue?
There are 3 correct answers to this question.
Response:

  • A. Floating time
  • B. Processing time
  • C. Queue time
  • D. Move time
  • E. Tear down time

Answer: A,C,D

 

NEW QUESTION 50
A warehouse manager likes to streamline the goods receipt (GR) process for production orders. Where can you enable the automatic GR?
There are 2 correct answers to this question.
Response:

  • A. Production scheduling profile
  • B. Scheduling margin key
  • C. Confirmation profile
  • D. Operation control key

Answer: A,D

 

NEW QUESTION 51
When would you use reporting point backflush in repetitive manufacturing?
There are 2 correct answers to this question.
Response:

  • A. You require an up-to-date inventory for components
  • B. For production lines with short lead times
  • C. When goods issues can wait for final confirmation
  • D. When you need to determine the work in progress

Answer: C,D

 

NEW QUESTION 52
Which of the following business processes are controlled by parameters that are dependent on production order type? Note: There are 2 correct answers to this question.

  • A. Implementation
  • B. Planning
  • C. Engineering change management
  • D. Inspection during production

Answer: A,B

 

NEW QUESTION 53
What capabilities does SAP S/4HANA embedded analytics provide?
There are 2 correct answers to this question.
Response:

  • A. Real time decision support
  • B. Comparison of current data with historical data to identify trends
  • C. Strategic analysis
  • D. Automatic update of story boards

Answer: A,C

 

NEW QUESTION 54
In the Manage Shortage view of the new SAP Fiori app "Monitor Material Coverage", what do the stars indicate?
Please choose the correct answer.
Response:

  • A. The presence of firmed planned orders
  • B. The priority of the proposed solution
  • C. The viability of the proposed solution
  • D. The presence of production orders

Answer: C

 

NEW QUESTION 55
An issue storage location was NOT found through the work center, bill of material (BOM)item, or material master. What determines whether the storage location can be derived from the production version?

  • A. Plant Data
  • B. MRP Controller
  • C. MRP Group
  • D. MRP Profile

Answer: C

 

NEW QUESTION 56
Which of the following are capabilities of multidimensional reporting in SAP S/4HANA embedded analytics?
There are 3 correct answers to this question.
Response:

  • A. Filters
  • B. Sort
  • C. Drilldown
  • D. Forecast
  • E. Scheduling

Answer: A,B,C

 

NEW QUESTION 57
What is the correct sequence of the following Activate methodology phases?
Please choose the correct answer.
Response:

  • A. Prepare, Explore, Realize, Deploy
  • B. Prepare, Realize, Iterate, Continuous Improvement
  • C. Validate, Realize, Test , Deploy
  • D. Prepare, Validate, Test, Go-Live

Answer: A

 

NEW QUESTION 58
What are the consequences when you assign a planned order to a production line manually, using the planning table in repetitive manufacturing?

  • A. The planned order is converted to a production order.
  • B. The planned order generates capacity requirements.
  • C. The planned order's component availability is checked
  • D. The planned order's components are copied from the picking list.

Answer: B

 

NEW QUESTION 59
How can Production Planning and Detailed Scheduling (PP/DS) enhance the standard planning functionality?
Please choose the correct answer.
Response:

  • A. By providing cross-plant planning and deployment
  • B. By providing future demands from demand figures in the past
  • C. By providing replenishment proposals with exact times
  • D. By providing multilevel material requirements planning

Answer: C

 

NEW QUESTION 60
Which options do you have to plan both quant ties and capacities during line loading in repetitive manufacturing? Note: There are 2 correct answers to this question.

  • A. Run PP/DS heuristics for repetitive manufacturing.
  • B. Run MRP with quota arrangement.
  • C. Run MRP with automatic selection of production version.
  • D. Assign planned orders manual lying the planning table.

Answer: A,B

 

NEW QUESTION 61
You are using the document management system (DMS) . Where should the DMS document links be assigned, to have them automatically copied to production orders?
There are 2 correct answers to this question.
Response:

  • A. Work center
  • B. Routing header
  • C. Bill of material
  • D. Material master

Answer: C,D

 

NEW QUESTION 62
What is SAP's strategic solution to perform Sales and Operations planning when you use SAP S/4HANA Manufacturing?
Please choose the correct answer.
Response:

  • A. PP Standard Sales and Operations Planning
  • B. APO Demand Planning
  • C. Flexible Planning
  • D. Integrated Business Planning

Answer: D

 

NEW QUESTION 63
In your project, you have several materials that are planned by different people. How can you assign the planning responsibility?

  • A. MRP planning file
  • B. MRP controller
  • C. MRP group
  • D. MRP type

Answer: B

 