[Dec 08, 2021] Latest SAP C_TS422_1909 Exam Practice Test To Gain Brilliante Result [Q31-Q53]

Share

Latest [Dec 08, 2021] SAP C_TS422_1909 Exam Practice Test To Gain Brilliante Result

Take a Leap Forward in Your Career by Earning SAP C_TS422_1909


SAP C_TS422_1909 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Outline best practices for using SAP S/4HANA
  • Production Orders in SAP S/4HANA
Topic 2
  • Introduction to SAP S/4HANA Supply Chain Planning
  • Material Requirements Planning in SAP S/4HANA
Topic 3
  • Differentiate consumption-based planning vs. MRP, outline new trends in production planning
  • Configure availability check for components
Topic 4
  • Outline both motivation and background of SAP S/4HANA
  • Determine BOM item category
  • Describe order status management and set user statuses
Topic 5
  • Explain and compare the different production methods in make-to-order
  • Outline the basics and master data of advanced planning
Topic 6
  • Introduction to SAP S/4HANA Production Planning
  • Outline production planning components and functions
Topic 7
  • Explain line load planning and confirmation
  • outline the capabilities of embedded analytics
Topic 8
  • Identify repetitive manufacturing specific master data
  • Apply material staging and confirmation
Topic 9
  • Describe the SAP HANA database concept and new user experience with SAP Fiori
  • Identify and explain production relevant master data
Topic 10
  • Select and apply planning strategies, use the planning table
  • Advanced Planning in SAP S/4HANA

 

NEW QUESTION 31
Your project uses process orders for the production of liquid chemicals. What can you define to ensure that the production flow happens only in physically connected tanks?

  • A. Work center hierarchy
  • B. Resource network
  • C. Operation network
  • D. Setup matrix

Answer: A

 

NEW QUESTION 32
The material master of your finished product contains MRP type "PD". You set a manual firming date in the stock requirements list. Which of the following will firm planned orders" There are 2 correct answers to this question.
Response:

  • A. Manually changing the quantity of a planned order
  • B. Creating a planned order within the planning time fence
  • C. Assigning a production scheduling profile
  • D. Setting a planning time fence in the Material Master Record

Answer: B,D

 

NEW QUESTION 33
What are main innovations in manufacturing in SAP S/4HANA?
There are 3 correct answers to this question.
Response:

  • A. Monitor Production Orders Fiori app
  • B. Rough-cut capacity planning
  • C. Flow manufacturing
  • D. Material Coverage Fiori app
  • E. Lock-free inventory movements

Answer: A,D,E

 

NEW QUESTION 34
How can you avoid order proposals for planned independent requirements with dates in the past?
There are 2 correct answers to this question.
Response:

  • A. Maintain adjustment parameter in the MRP group
  • B. Reorganize planned independent requirements
  • C. Set the requirements reduction indicator in the requirements class
  • D. Use a planning strategy with requirements consumption

Answer: A,B

 

NEW QUESTION 35
How can you achieve a feasible production plan in case of capacity constraints? Note: There are 3 correct answers to this question.

  • A. Adjust the available capacity.
  • B. Execute a new production planning run.
  • C. Select an alternative mode on a resource.
  • D. Reduce the planning window.
  • E. Form optimum sequences to reduce setup times.

Answer: A,C,E

 

NEW QUESTION 36
At the end of the MRP run you receive the exception message "Reschedule In Operation". What caused the message to be generated?
Please choose the correct answer.
Response:

  • A. The requirements date occurs before that of a firmed planned receipt
  • B. The requirements date occurs that of a firmed planned receipt
  • C. The requirement no longer exists
  • D. A firmed planned receipt cannot be rescheduled

Answer: A

 

NEW QUESTION 37
Where does the system check master data selection settings during the creation of planned orders and production orders? Note: There are 3 correct answers to this question.

  • A. In the production order type
  • B. In the production version
  • C. In the MRP controller
  • D. In the bill of materials (BOM)
  • E. In the routing

Answer: A,C,E

 

NEW QUESTION 38
Which of the following objects can you release so that the business transactions for process order execution and process management can be executed?
There are 2 correct answers to this question.
Response:

  • A. Individual phases
  • B. Individual control recipes
  • C. Individual process instructions
  • D. Individual operations

Answer: A,D

 

NEW QUESTION 39
Where can you maintain consumption mode and consumption periods for planning strategies?
There are 2 correct answers to this question.
Response:

  • A. In the requirements class
  • B. In the plant parameters
  • C. In the material master
  • D. In the MRP group

Answer: C,D

 

NEW QUESTION 40
Which of these are layers in SAP Best Practice content?
There are 3 correct answers to this question.
Response:

  • A. Scope items
  • B. Solution packages
  • C. Building blocks
  • D. Process diagrams
  • E. Configuration guides

Answer: A,B,C

 

NEW QUESTION 41
Which time elements are part of a routing operation? Note: There are 3 correct answers to this question.

  • A. Move time
  • B. Wait time
  • C. Float before production
  • D. Pick/pack time
  • E. Queue time

Answer: B,D,E

 

NEW QUESTION 42
What does the bill of material usage (BOM usage) control at the BOM item level?
Response:

  • A. Default unit of measure
  • B. Default values for the item status
  • C. Allowed material type
  • D. Maximum allowed low-level code

Answer: C

 

NEW QUESTION 43
What is the purpose of collective orders?

  • A. To post any component withdrawals single back flush with order confirmation
  • B. To manage production orders for an entire finished product on multiple levels
  • C. To combine order management of co-products and by-products with the main product
  • D. To post production costs on a cost collector instead of the production order

Answer: B

 

NEW QUESTION 44
Which of the following are included as SAP S/4HANA Sales Simplifications?
There are 3 correct answers to this question.
Response:

  • A. Settlement Management replaces ERP SD Rebates
  • B. SAP GTS replaces ERP SD Foreign Trade
  • C. SAP Revenue Accounting replaces ERP SD Revenue Recognition
  • D. SAP Sales Support replaces SAP CRM
  • E. SAP order Fulfillment replaces ERP SD Availability Checking

Answer: A,B,C

 

NEW QUESTION 45
What determines whether the planned independent requirements in MRP consume other requirements?

  • A. Requirements profile
  • B. Order type
  • C. Consumption sequence procedure
  • D. Requirements type

Answer: D

 

NEW QUESTION 46
Your quality department detects a deviation in a raw material batch. Unfortunately, this batch has already been used in production. How can you identify all affected finished goods stocks?

  • A. Use batch determination.
  • B. Use the material where-used report.
  • C. Use the material staging report.
  • D. Use the batch information cockpit.

Answer: D

 

NEW QUESTION 47
Which advanced functionality has been embedded in SAP S/4HANA?
There are 3 correct answers to this question.
Response:

  • A. Available-to-promise
  • B. Demand planning
  • C. Supply Network Planning
  • D. Capacity planning
  • E. Backorder processing

Answer: A,D,E

 

NEW QUESTION 48
Which chart types does the tabular planning table provide in SAP S/4HANA? Note: There are 2 correct answers to this question.

  • A. Work center capacities chart
  • B. Order (pool) chart
  • C. Orders (dispatched) chart
  • D. Capacity requirements chart

Answer: A,D

 

NEW QUESTION 49
The setup time on the production line to produce a material is extensive. You would like to avoid multiple setups and limit the production of the material based on a planning calendar.
Which type of lot size procedure should you use to accomplish this?
Please choose the correct answer.
Response:

  • A. Fixed lot sizing
  • B. Periodic lot sizing
  • C. Exact lot sizing
  • D. Minimum lot sizing

Answer: B

 

NEW QUESTION 50
In a production process, you need a certain amount of liquid as input material. The source tank is directly connected to the reactor. How can you process consumption postings?

  • A. Kanban
  • B. Picking list
  • C. Transfer Order
  • D. Backflushing

Answer: B

 

NEW QUESTION 51
Which time elements can be reduced by a reduction strategy? Note: There are 3 correct answers to this question.

  • A. Float after production
  • B. Wait time
  • C. Move time
  • D. Goods receipt processing time
  • E. Queue time

Answer: A,C,E

 

NEW QUESTION 52
Before a user can add multiple production versions in a material master, what information should be collected?
There are 3 correct answers to this question.
Response:

  • A. Work center hierarchy
  • B. Lot sizes
  • C. BOM status
  • D. Validity dates
  • E. Task list group number

Answer: B,C,D

 

NEW QUESTION 53
......

Authentic Best resources for C_TS422_1909 Online Practice Exam: https://www.dumpstests.com/C_TS422_1909-latest-test-dumps.html

Updates Up to 365 days On Developing C_TS422_1909 Braindumps: https://drive.google.com/open?id=1TKKJkcRdEVwPQH36pmaupudzVpOWG65i