NEW QUESTION 43
In your plant, MRP is activated. Which options do you have to exclude a material from the MRP run?Note:
There are 2 correct answers to this question.
- A. Use a specific MRP controller.
- B. Use a specific MRP type.
- C. Use a specific material group
- D. Use a specific material status.
Answer: A,B
NEW QUESTION 44
You have a scheduling agreement with a vendor. You want classic MRP to automatically create schedule lines in case of material shortage. What must you do? Note: There are 2 correct answers tothis question.
- A. Set the creation indicator for purchase requisitions on the initial screen of the MRP run.
- B. Add the agreement to the source list and mark itfor MRP relevance.
- C. Set the creation indicator for delivery schedule lines on the initial screen of the MRP run.
- D. Add the agreement to the quota arrangement and mark it for MRP relevance.
Answer: B,C
NEW QUESTION 45
Which of the following is a valid sequence of the main activities in product on order processing?
- A. Creation, scheduling, release, material withdrawal, confirmation
- B. Creation, staging, release, material withdrawal, confirmation
- C. Creation, scheduling, release, variance calculation, confirmation
- D. Creation, release, scheduling, material withdrawal, confirmation
Answer: A
NEW QUESTION 46
When do you use variant bills of materials (BOMB)?
- A. When multiplematerial is have similar BOMB
- B. When a material has multiple BOMB
- C. When a material has a configurable BOM
- D. When multiple material also have the same BOM
Answer: D
NEW QUESTION 47
The MRP run detected a shortage of a material that you source from an external supplier in full pallets. How can you make sure you will only receive full pallets?
- A. Use the MRP type for vendor managed inventory.
- B. Use the fixed lot size procedure.
- C. Use the reorder point.
- D. Use the minimum order quantity.
Answer: B
NEW QUESTION 48
Your project team decides to use a make-to-order planning strategy for a strategic material in discretemanufacturing. What is the impact of this decision? Note: There are 3 correct answers to this question.
- A. Sales order-specific planning run is required.
- B. Production orders are created with sales order reference.
- C. Storage location MRP areas are required.
- D. Net requirements calculation is sales order-specific.
- E. Sales order-specific stock is created
Answer: B,D,E
NEW QUESTION 49
You want to insert an operation at a certain time on a work center. The planning direction is forward. The desired dispatching time coincides with an operation that has previously been dispatched. How does the insertion take place?
- A. The new operation is inserted at the desired time; the previously dispatched operation is moved forward.
- B. The previously dispatched operation stays assist the new operation is inserted before the dispatched operation.
- C. The previously dispatched operation stays as is the new operation is insertedafter the dispatched operation.
- D. The new operation is inserted at the desired time the previously dispatched operation is moved backward.
Answer: D
NEW QUESTION 50
Which time elements are relevant for lead t me scheduling of a product on order? Note: There are 2 correct answers to this question.
- A. Setup time
- B. Planned delivery time
- C. Float after production
- D. Total replenishment lead time
Answer: B,C
NEW QUESTION 51
Which of the following business processes are controlled by parameters that are dependent on production order type? Note: There are 2 correct answers to this question.
- A. Engineering change management
- B. Planning
- C. Inspection during production
- D. Implementation
Answer: B,D
NEW QUESTION 52
How can you limit the validity of a bill of material (BOM)? Note: There are 2 correct answers to this question.
- A. By material type
- B. By industry
- C. By plant
- D. By period
Answer: C,D
NEW QUESTION 53
In a production process, you need acertain amount of liquid as input material. The source tank is directly connected to the reactor. How can you process consumption postings?
- A. Backflushing
- B. Transfer Order
- C. Kanban
- D. Picking list
Answer: D
NEW QUESTION 54
In the Schedule Production app, which settings can you make in the planning strategy? Note: There are 3 correct answers to this question.
- A. Scheduling control (finite/infinite)
- B. Finiteness level (0...1)
- C. Planning mode (bucket/sequence)
- D. Fixed pegging (on/off)
- E. Direction (forward/backward)
Answer: A,C,E
NEW QUESTION 55
Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4HANA. When can you use mode selection?
- A. When multiple planned orders exists in one resource
- B. When multiple operations are maintained for one product
- C. When alternate resourcesare used within one operation
- D. When multiple production versions are maintained for one product
Answer: C
NEW QUESTION 56
If the stock level drops below the reorder stock in reorder point planning, what is the system logic to trigger procurement?
- A. Fill up based on the lot size procedure
- B. Fill up to the reorder stock level
- C. Fill up to the maximum stock level
- D. Fill up to the safety stock level
Answer: A
NEW QUESTION 57
Your company produces a finished good based on a forecast and expects it to being stock when customers order it. If customers order more than the forecasted quantity, the production quantity should be increased to try to meet the extra demand. Which planning strategy do you use?
- A. Make-to-order production (20)
- B. Make-to-stock production (10)
- C. Planning without final assembly (50)
- D. Planning with final assembly (40)
Answer: D
NEW QUESTION 58
......
Prepare for your SAP certification with the updated DumpsTests C-TS422-2020 exam questions: https://drive.google.com/open?id=1VBbxhQ2lbDV53FikB0kvnUSSigNLJYOY