NEW QUESTION # 34
Valve locations per CFR 195

  • A. Each side of a water crossing that is more than 100, wide from high water mark to high water mark. Unless the Administrator finds they are not justified.
  • B. To remedy threats to human health and the environment from unexpected releases and historical mistakes in hazardous waste management
  • C. 1. Survey 2. Clearing and grading 3. Stockpiling and stringing 4. Field bending 5. Ditching and excavation 6. Welding 7. Coating 8. Lowering In. 9. Backfilling 10. Cathodic Protection 11. Hydrostatic testing 12. Clean up and restoration
  • D. Area within 24" of facilities or the distance mandated by state law, whichever is greater. NOTE: CGA & INGAA says 18".

Answer: C


NEW QUESTION # 35
Where should emergency information for chemicals in substances be located?

  • A. OSHA 1926.650 and 1926.651, (29 CFR 1926) safety and health regulations for construction
  • B. Set of interrelated activities that use inputs to deliver an intended result(ISO 9000 3.4.1)
  • C. Lifting/hoisting pipe and equipment, excavation your pipe lines or other utilities, marking/labeling, and other programs to increase awareness
  • D. Within a set of written process safety information controls(29 CFR 1910.119, general knowledge)

Answer: D


NEW QUESTION # 36
Red

  • A. Electrical
  • B. Grading
  • C. Mechanical
  • D. Thermal

Answer: A


NEW QUESTION # 37
For type ______, the Top width = 1.5 x depth + bottom width

  • A. Site -specific
  • B. A
  • C. Is
  • D. C

Answer: C


NEW QUESTION # 38
Key areas to verify certification and qualification include?
a) office personal
b) heavy equipment mechanics
c) welders, blasting personal
d) management

  • A. c) welders, blasting personal(API 1169 7.2.3)
  • B. Manufacturing acceptance criteria(API Spec Q1 3.1.15
  • C. Spike test(API 1110 4.1.7.2)
  • D. A right of way(INGaA Crossing Guideline 11 M)

Answer: B


NEW QUESTION # 39
On _______, check ANSI ratings, overall condition, trim, coating, operability, flange faced and/or bevels and body condition

  • A. Refuse
  • B. Valves
  • C. Does
  • D. Permit

Answer: C


NEW QUESTION # 40
The total amount of residual air in the test section should not exceed ___________ of the volume of the test section?

  • A. 475+69(API 1169 7.3.4)
  • B. 50%(API 1104 7.3)
  • C. Encroachment Area
  • D. 5%(API 1110 5.3)

Answer: C


NEW QUESTION # 41
Each transmission line must have _________ inches of clearance from any other underground utility not related to the transmission line.

  • A. 0
  • B. 1
  • C. 2
  • D. 3

Answer: D


NEW QUESTION # 42
Where should an environmental inspector ensure that highly visible flagging is used?

  • A. Indicate whether power or hand tools are to be used
  • B. boundaries of sensitive resource areas, water bodies, wetlands or areas with special requirements.
  • C. Danger - High Pressure, Testing in progress
  • D. 49 CFR 192.327

Answer: B


NEW QUESTION # 43
What API RP must be followed in order to used pipe transported via railroad if it has an OD to WT ratio of _________ (or greater) and will operate at a hoop stress of _______ of SMYS.
Standard?
Exception?

  • A. it provides proper support for the pipe and prevents damage to the pipe and its coating
  • B. Tag or documents certifying it has been inspected
  • C. Stanchions, anchors, heavy anchors, heavy concrete coating or equivalent means.
  • D. 70 to 1 / 20 / API 5LI - Code 192.107 - Ship or barge will have to abide by API 5LW

Answer: B


NEW QUESTION # 44
__________ are intended to stop the flow of sediments and to prevent
the deposition of sediments beyond approved workspaces or into sensitive resources.

  • A. Sediment Ponds
  • B. Distress
  • C. Design Validation
  • D. Sediment Barriers

Answer: D


NEW QUESTION # 45
Pipe buried after 1972 must have cathodic protection within _______ of being installed.

  • A. One year
  • B. Three years
  • C. Six months
  • D. Two years

Answer: A


NEW QUESTION # 46
Blue

  • A. Blackwater
  • B. Safe Water
  • C. Potable Water
  • D. Reclaimed Water

Answer: B


NEW QUESTION # 47
Define process in terms related to process.

  • A. Hearing protection is used when the work environment noise level exceeds 85 dbA over an 8-hour period
  • B. Part of quality management focussed on setting quality objectives and specifying necessary operational processes, and resources to achieve the quality objectives(ISO 9000 3.3.5)
  • C. Is the area where the edge of the disturbance is within 25 feet of the centreline of the existing facilities.
  • D. Set of interrelated activities that use inputs to deliver an intended result(ISO 9000 3.4.1)

Answer: D


NEW QUESTION # 48
Define Owner

  • A. Is the entity that owns our operates the existing pipeline facilities. The owner may designate a third-party or parties to perform the tasks necessary to enable a safe crossing of its facilities by crossing company but remains responsible for the work performed by such third-party.
  • B. Is the singular point of contact identified within the company of the crossing company and the owner who has the responsibility to communicate about the safely managed crossing. There will be a cross and Company designated contact and an owner designated contact.
  • C. An individual qualified to monitor, assess, evaluate, verify, discuss, decide, resolve, report, and document pipeline construction activities to ensure the requirements of the design, drawings, specifications, regulations, and Industry practises are being met safely, effectively, and in an environmentally sound manner.
  • D. Is the vertical separation between the existing pipeline and facilities and where the new pipeline is being installed. The recommended crossing clearance distance between the new pipeline and the existing facilities is two feet (24"). The minimum distance is one foot (12"). The new pipeline should be installed at a level depth across the ROW, if practicable.

Answer: A


NEW QUESTION # 49
HDD

  • A. Horizontal directional drilling
  • B. Root cause analysis
  • C. Hydrostatic testing
  • D. Transporting to location

Answer: B


NEW QUESTION # 50
During stringing, triple jointed pipes shall be placed?

  • A. Set of interrelated activities that use inputs to deliver an intended result(ISO 9000 3.4.1)
  • B. Acceptance criteria(API Spec Q1 3.1.1)
  • C. Tensile, band, Nick break, visual(AP 1104 6.4, 6.5.2)
  • D. Were bending is not required(CEPA Table 57)

Answer: B


NEW QUESTION # 51
What can an environmental inspector do before clearing, maintaining and use of access access roads?

  • A. Verify that the limits of authorized construction work areas and access roads are abided by
  • B. Identifying, documenting and oversee activity
  • C. Tensile-strength specimens shall be subject to the nick-break test
  • D. 49 CFR 192.327

Answer: D


NEW QUESTION # 52
A _______________ is needed to deposit refuse in navigable waters from construction or improvements.

  • A. Submit
  • B. Predict
  • C. Prepare
  • D. Permit

Answer: D


NEW QUESTION # 53
Define Contractor;

  • A. Liquids having a flashpoint at or above 100°F are known as class 11 liquids the most common or diesel fuel, class III liquids include jet fuel and motor oil
  • B. Process of establishing, documenting, implementing, maintaining and continually improving a quality management system.(ISO 9000 3.4.3)
  • C. An entity that includes the primary organization and any subcontractors engaged in pipeline construction covered by ARPI 1169 3.1.1
  • D. terrain features; landowner issues; road, railroad, or waterway crossing; environmental features; cultural features and protected resources (i.e. drinking water and proximity to occupied facilities)

Answer: C


NEW QUESTION # 54
________ Should meet specified minimum length restrictions consistent with pipe diameter and owner/operator requirements.

  • A. Pup joints
  • B. Quality policy
  • C. Hot bends
  • D. The system power source

Answer: D


NEW QUESTION # 55
Trenches _____ deep or greater require a protective system designed by a PE

  • A. 20,
  • B. 100,
  • C. 10,
  • D. 25,

Answer: A


NEW QUESTION # 56
Color used for oil and gas lines

  • A. Green
  • B. White
  • C. Blue
  • D. Yellow

Answer: D


NEW QUESTION # 57
Define Encroachment Area

  • A. A part of quality management Focused on the ability to fulfil quality requirements.The quality requirements can be related to any aspect such as effectiveness efficiency or traceability.
  • B. Part of quality management focussed on providing confidence that quality requirements will be fulfilled.(ISO 9000 3.3.6)
  • C. Is the area where the ground disturbance occurs within 50 feet of the centerline of the existing facility or within the existing facilities ROW or easement, whichever is greater. Additional distance may be required for the constructions such as topography side-hill lays, catholic operating equipment, and topography.
  • D. Set of interrelated activities that use inputs to deliver an intended result(ISO 9000 3.4.1)

Answer: D


NEW QUESTION # 58
......

API-1169 Dumps are Available for Instant Access: https://www.dumpstests.com/API-1169-latest-test-dumps.html

Practice with these API-1169 dumps Certification Sample Questions: https://drive.google.com/open?id=1wxFNf9c83MBEyEHqjfG_3FjEsI9lQqed